Monument

The monument plaques have finally been installed. They look really good. This is the right one with the house number.

Monument

And the left one with the name of the house.

Septic Field

They started installing the septic tank today. They made a lot of progress. Here you can see the distribution box--the black box in the center--and the pipes running to the drain field.

Septic Field

This is one of the four 100'-long drain tiles for the septic field. The other three are to the right and already partially covered. They are using a new, no-gravel insert for the field. It really goes in fast.

Septic Field

This is the line from the house--the house is right behind my back. You can see the top of the septic tank. It is a 1200 gallon concrete tank. I was a little surprised. I expected a plastic tank.

Driveway

They dumped the gravel on the driveway yesterday and compacted it today.