Hardwood Floor

Hardwood Floor install continues. This is the powder room.

Hardwood Floor

This picture is from yesterday. Today, they have worked their way over to middle of the room.

Hardwood Floor

This is the kitchen. This is also from yesterday. Today they are all the way to the end of the partion wall. I would say the hardwood is at least 2/3's done. They have moved much faster these past two days.

Tile

Most of the tile has been delivered. The guest bathroom tile is missing though.

More Doors

There are now twenty doors in the garage as well as all the bi-folds. There are only supposed to be 18 by our count.

Paint

They have begun painting. The camera flash makes the walls look a little lighter than they are. I really like the color.

Paint

This is the dining room. You can't see it very well in the picture, but the tray ceiling looks really good with the walls painted and the ceiling white.

Paint

Here, next to the white primed walls, you can really see that the paint it darker than it looks in the other pictures.

Fireplace

They are starting to put the hardwood floor around the fireplace. You can see the area they blocked off where the tile for the hearth will go.

Plumbing

Now that the well tank is moved the plumber has come back and connected the sill cocks to the well. So we should have outside water and be able to water the sod that will be installed.

Plumbing

This is where the water softener will go. So after the sill cocks, the main line runs here then the soft water will go out to the rest of the house.