Well
The well has been drilled. Don't know yet how far they had to go down. That gray stuff around it is not concrete. It is a foam that they use as a lubricant for the drill. |
|
|
Drywall
They are mudding and taping now. You can see some of the corner bead on the soffit. |
|
|
Drywall
The great room. I think they have one coat on most everything on the first and second floor. |
|
|
Furnace
This is our geothermal heat pump that took two months to arrive. I had Scott stand by it to show how big it is. It takes 36x36 filters. Don't know where we are going to finds those! |
|
|
Geothermal Lines
The geothermal lines have been run into the basement. They are bigger than I expected, probably 1 1/2" pipe. |
|
|
|
Geothermal Lines