Well

The well has been drilled. Don't know yet how far they had to go down. That gray stuff around it is not concrete. It is a foam that they use as a lubricant for the drill.

Drywall

They are mudding and taping now. You can see some of the corner bead on the soffit.

Drywall

The great room. I think they have one coat on most everything on the first and second floor.

Furnace

This is our geothermal heat pump that took two months to arrive. I had Scott stand by it to show how big it is. It takes 36x36 filters. Don't know where we are going to finds those!

Geothermal Lines

The geothermal lines have been run into the basement. They are bigger than I expected, probably 1 1/2" pipe.

Geothermal Lines

Over to the left you can see the geothermal lines run from the crawl space into the basement.