Framing Materials

They have delivered all the framing materials for the floors. Its all engineered lumber. There are some really long joists!

HVAC & Plumbing

The first of the HVAC and plumbing has to be put under the basement slab. Here you can see the two vents that will be in the gameroom.

HVAC & Plumbing

You can see the tall stack that is the link to the HVAC for the under-slab ducts. The group of plumbing in the middle is for the basement bathroom. The black circle behind the tall duct is the effluent pump. The one to the right is the sump pit.

HVAC & Plumbing

These vents will end up in the storage area which is also where the exercise equipment will be.

HVAC & Plumbing

The basement will be one zone of our four-zone HVAC system.

Crawl Space

They also finished filling in the crawl space with pea fill.

Crawl Space

Sand Pile

For some reason we now have a sand pile. Since they bring in all the cement pre-mixed in trucks I am not sure what it is for. Maybe for morter?

HVAC & Plumbing

Theater Floor

You can now clearly see how part of the theater floor will sink lower than the rest of the basement. The theater room actually includes part of the upper level. There will be a wooden platform added later on the lower level to give three tiers of seating.

Theater Floor

You can also see the sump pit. I am not sure they really moved it enough to be out of the way of the theater emergency exit. Have to talk to the builder again.