Waterproofing

They have put the foam panels on the outside of the foundation. In addition to bing water proof themselves, the panels have channels on the outside that direct water down to the drain tiles. They are bolted on.

Waterproofing

Backfilling

They have started to backfill. Surprisingly they are putting in a ton (actually several tons) of pea fill. I thought they would just put the dirt back.

Backfilling

Backfilling

On this end of the house I am sure they will now just fill with dirt.

Backfilling

Backfilling

Backfilling

They have pushed the dirt back around the crawl space and garage.

Backfilling

They have also put lots of pea fill in the garage and driveway just next to it in preparation for the garage slab.

Wire

Low voltage wire waiting to be installed in the new house. This is not all; there is still more on order. In total, there will be 16,000 feet.