First Floor Sheathing

They have started on the sheathing. All unheated walls and the corners of heated walls will be OSB. All the heated walls will be foiled-faced foam. This is the garage.

First Floor Sheathing

The corner of the sun room.

First Floor Sheathing

Outside of the nook.

First Floor Sheathing

Outside dining room and garage.

Second Floor Joists

They also have put up some of the major beams for the second floor.

Second Floor Joists

Second Floor Joists

The start of the bridge.

First Floor Framing

Looks like they also spent the day getting everything plumb and square and putting up braces.

First Floor Framing

First Floor Framing

You can see here that there is actually a window in the front of the garage. They will cut the hole out later.

First Floor Framing

First Floor Framing

Sheathing

This is the foil-faced foam that will sheath most of the house. I don't know what the 2" blue foam on top is for yet.