First Floor Sheathing
They have started on the sheathing. All unheated walls and the corners of heated walls will be OSB. All the heated walls will be foiled-faced foam. This is the garage. |
|
|
First Floor Sheathing
The corner of the sun room. |
|
|
First Floor Sheathing
Outside of the nook. |
|
|
First Floor Sheathing
Outside dining room and garage. |
|
|
Second Floor Joists
They also have put up some of the major beams for the second floor. |
|
|
|
Second Floor Joists
|
|
|
Second Floor Joists
The start of the bridge. |
|
|
First Floor Framing
Looks like they also spent the day getting everything plumb and square and putting up braces. |
|
|
First Floor Framing
|
|
|
First Floor Framing
You can see here that there is actually a window in the front of the garage. They will cut the hole out later. |
|
|
|
First Floor Framing
|
|
|
First Floor Framing
|
|
|
Sheathing
This is the foil-faced foam that will sheath most of the house. I don't know what the 2" blue foam on top is for yet. |
|
|