Front Porch
They have most of the front porch roof done. They need to finish the roof detail on the right and put on drip edge then that is about as far as they can go until the porch is done I think. |
|
|
|
Chimney
They put some trim around the top of the chimney. |
|
|
|
Stair Wall
They cut down the temporay wall that was next to the stair and are now working on the real wall. Interesting how they are doing it. |
|
|
|
Bonus Room Rafters
They built up the bonus room rafters so there is space for enough insulation to meeting the roof R-Value requirements. |
|
|
|
Doorway Cutouts
The last of the bottom plates were cut out of the doorways on the second floor. This is the door to the bonus room. You can see that they also put in some 1x4's to build up the door frame to the correct size. |
|
|