|
|
Electrical
The electrician is beginning to finish some of the wiring, getting it ready for the drywall. |
|
|
Electrical
These are the can lights that are in the kitchen. |
|
|
Electrical
The electricians have put a box in the attic space above the master bedroom. Not sure why. It may a junction box or maybe they are actually going to put a ceramic fixture up there. |
|
|
Electrical
The beginnings of our two panels. |
|
|
Low-voltage
We needed a box on the outside front wall by the door for a security camera that will be installed in the future. We went ahead and had the mason set it in the brick. We will pull the wire later. |
|
|
|
Roofing
They have started on the roofing. Of course they started on the easy part, the 6/12 pitched roof. :) |
|
|
Roofing
This is a view of the roof from the rear bonus room window. |
|
|
Siding
They are just starting the siding. They have the corners, the starting trim, and the "J" channel installed on the east wall here. |
|
|
Siding
I took this little scrape of siding and set it on the brick to show how well it matches. It looks really good. |
|
|
Brick
They continue to work on the brick. They will finish the front tomorrow I am sure. Hopefully the windows can be installed in the garage so they can keep going and not get held up. |
|
|