Our Lot
Breaking Ground
Excavation 1
Excavation 2
Footings 1
Footings 2
Footings 3
Foundation 1
Foundation 2
Foundation 3
Foundation 4
Foundation 5
Foundation 6
Foundation 7
Foundation 8
Backfilling 1
Under-slab Plumbing and HVAC
Basement and Garage Slabs
Backfill 2 & First Grading
Sill Plates
Basement Framing 1
Basement Framing 2
First Floor Joists 1
First Floor Joists 2
First Floor Decking
First Floor Framing 1
First Floor Framing 2
First Floor Framing 3 and Sheathing 1
First Floor Sheathing 2/Second Floor
Joists |
Second Floor Decking
Second Floor Framing 1
Second Floor Framing 2/Two-Story
Framing 1
Two-Story Framing 2
Roof Trusses 1
Roof Trusses 2
Roof Trusses 3/Roof Sheathing 1/Bonus Room 1
Roof Sheathing 1.5/Bonus
Room 1.5
Roof Sheathing 2/Bonus Room 2
Roof Sheathing 3/Bonus Room 3
Roof Sheathing 4
Roof Sheathing 5
Framing Detail Work
Windows 1 and Soffits
Windows 2
Windows 3/Front Porch Roof 1
Front Porch Roof 2
Misc Framing & House Model
Foundation Fix & Front
Porch
Plumbing 1
Framing Rework
Garage Doors
and Soffits 1
Soffits 2,
Brick 1, Plumbing 2, and Electrical 1
Brick 2, Plumbing 3, and
HVAC 1
Brick 3,
Plumbing 4, and Electrical 2
Brick 4, Electrical 3 and
HVAC 2
Brick 4.5, Electrical 3.5, Soffits 2.5,
Interior Windows
Brick 5, Electrical 4, and
Soffits 3
Brick 6, Electrical 5, Roofing
1, Siding 1
Brick 7, Roofing 2, Siding2,
Fireplace
Brick 8, Electrical 6, Siding
3, Window Trim 1
Brick 9, Siding 4, Window
Trim 2
Siding 5, Deck 1, Plumbing 5,
Porches, LV Wiring
Deck 2, Front Porch, Plaques
LV Wiring 2, Insulation 1
LV Wiring 3, Insulation 2
Deck 2, HVAC 3, Roofing 3
HVAC 4 |
HVAC5, Plumbing 6, Electrical 7,
Deck 3
HVAC 6, Deck 4, Monuments
1
Deck 5, Front
Porch Brick, Theater Ceiling
Brick 10, Deck 6,
HVAC7, Stairs
Deck 7,
Drywall 1, Driveway 1
Drywall 2
Geothermal Loop 1, Misc
Geothermal Loop 2
Drywall 3, Geothermal
Loop 3
Electrical 8
Drywall 4,
Electrical 9, HVAC 8, Insulation 3
Driveway 2, Well
Septic
Field 1, Monuments, Driveway 3
Septic Field 2, Ceilings 1, Gutters 1, HVAC 9
Ceilings 2,
Gutters 2, Driveway 4
Driveway 5,
Painting 1, Flooring 1
Driveway 6,
HVAC 10, Flooring 2
HVAC 11, Flooring
3, Trim 1
Flooring 4,
Painting 2, Plumbing 7
Painting 3, Trim 2
Flooring 5,
Cabinets 1, Trim 3
Tile 1, Cabinets
2, Trim 4
Tile 2, Cabinets
3, Trim 5
Cabinets 4,
Trim 6, Stair Rails, Finish Electrical 1
Cabinets 5, Stairs 1, Finish Electrical 2
Stairs 2, Finish
Electrical 3, Plumbing 8
Stairs 3,
Tile 3, Built-ins 1
Cabinets 6, Plumbing 9,
Misc
Cabinets7,
Plumbing 10, Misc
Phase converters, wainscoting, etc.
Cabinets 8,
Built-ins 2, Stairs 4, Misc
Finish Electrical 4, Closet
Shelves, Built-ins 3
Carpet 1, Marble 1, Built-ins 4
HVAC 12, Plumbing 11, Marble 2,
Built-ins 5
Plumbing 12, Kitchen
Island
Final Walkthru |