Stairs

The first floor stairs are all done. They look awesome. The carpenter did an excellent job on the flare out at the bottom. The red on them is protective paper. They just need to be stained now.

Water heaters

The two water heaters have been delivered.

Great Room Shelves

The first section of the great room built-ins have been delivered. This is just the upper section. There is a lower cabinet this section sits on.

Shower Tile

The tile has been laid in the master bath shower. The shower and the floor tile have been grouted also. The synthetic marble has been delivered; its in the garage.

Library shelves

The guy building the built-ins has started to install the library shelves. If you look close you can see they are now sitting on a toe kick and nailers have been put on the wall to the left. They are anchored in now and the outlets cut out.